Thursday, 29 August 2013

TFL Tender Results - August 2013



Route
Current Operator

New Operator

Current PVR

Award PVR
QSI Standard
Contract Ref.
Vehicle type
Contract Start Date

TRANCHE 440:
262
Stagecoach East London
Stagecoach East London
12
12
0.80 mins EWT
QC 44001
New & existing double deck
29th March 2014

372
Stagecoach East London
Stagecoach East London
6
6
86% on time
QC 44002
New double deck
29th March 2014

396
Stagecoach East London
Stagecoach East London
4
4
86% on time
QC 44003
Existing single deck
29th March 2014

473
Stagecoach East London
Stagecoach East London
10
10
0.80 mins EWT
QC 44004
Existing double deck
29th March 2014

TRANCHE 441
54
Metrobus
Stagecoach Selkent
14
16
1.00 mins EWT
QC 44101
New double deck
3rd May 2014

75
Metrobus
Stagecoach Selkent
13(a)
13(b)
1.00 mins EWT
QC 44102
New double deck
26th April 2014

T31
Arriva London South
Arriva London South
9
9
0.60 mins EWT
QC 44103
Existing single deck
10th May 2014

Routes 54, 75, 262, 372 and 396 are awarded as specified, including the frequency increase on route 54 and the double deck conversion of route 372. Route 473 is awarded on the basis of the current route structure. Route T31 is awarded on the basis of using the current allocation of 55 capacity vehicles.

All new vehicles in the above awards will be hybrids, the existing vehicles will be diesels.

A total of 23 existing vehicles will be used on routes 262 and 473. These are currently allocated to route 96. 

(a) Fleet PVR: 14th bus used in PM peak crosslinked from route 54.
(b) Fleet PVR: 14th bus used in PM peak crosslinked from route 269.

Thank you for reading this post and for visiting our blog.
Remember to stay safe.

3 comments:

  1. Which garages are the routes going to be operated from

    ReplyDelete
    Replies
    1. Sorry about that. I will list all the garages on the post. :P

      LB67 ;)

      Delete
  2. Routes 54 and 75 will be operated from Stagecoach London Selkent Catford Garage (TL).

    ReplyDelete

Please feel free to leave a comment!