Tuesday 3 September 2013

Route 11 - NB4L Route Learning

 © All rights reserved by Au Morandrate
 © All rights reserved by Au Morandrate
As all Londoners know ... Route 11 is to be converted to NB4L operation from 21st September 2013. For some people, they will too agree this is another horrid date to note down. Currently, 18 days before the conversion begins; the drivers are still testing the LT's out and familiarizing the route before the big, horrible day comes. ;(

The only things people are looking out for LT41 - LT60 is that will they actually have air cooling fans that actually work like those on the prototypes LT1 - LT8. Will the PA's be nicer than those with Arriva and Metroline? Same Thing ...



Thank you for reading this post and for visiting our blog.
Remember to stay safe.

1 comment:

  1. As long as the problems for the 24 have been addressed in these NB4Ls I have no problem with them then being on the route. I personally think this should of been the first route fully converted to NB4L, the 24 should of come after but no worries the 11 keeps them for longer. The 11 is the tourist route, the NB4L is a tourist attraction these to go great together. Can't wait to see which route is next for conversion.

    ReplyDelete

Please feel free to leave a comment!